Skip to content
Enquire
Small phinisi anchored in a bay below hills

Custom builds · Modern designs

Custom Komodo Boats

New phinisi and liveaboards designed from the keel up: your cabins, layout and systems, built in 12–24 months for private use or charter.

The short answer

A new Komodo boat is designed with the builder from the keel up: cabin plan, galley, tanks and engine chosen for private cruising, diving or charter. Traditional ironwood or teak hulls carry modern navigation and propulsion. Builds typically take 12–24 months.

From brief to sea trial

You see the boat on paper before a plank is cut.

  1. 01

    Consultation

    Your use, cabins, galley, tanks and engine.

  2. 02

    Drawings

    Architectural drawings and 3D renderings before construction starts.

  3. 03

    Build

    Hull construction, interior fit-out and engine installation.

  4. 04

    Sea trials

    Final trials before the boat goes into service.

Start a build brief

Design checklist

Decide these early: they shape cost, layout and build time.

Layout decisions

  • Number of cabins
  • Size of the galley
  • Water and fuel tank capacity
  • Engine type

Modern features

  • Air-conditioned cabins with en-suite bathrooms
  • Spacious sundecks
  • GPS, radar and satellite communication
  • Dive compressor and gear
  • Water desalinator
  • Dedicated crew quarters

Phinisi price & cost

Modern finishes

The spaces buyers ask for most. Photos are illustrative.

Luxury suite with a king bed
01 Air-conditioned suite with en-suite bathroom
Deluxe guest cabin
02 Guest cabin with individual climate control
Couple relaxing on the bow of a phinisi
03 Open deck for relaxing
Deck dining set up at sunset
04 Communal dining on deck
Stateroom with a sea-view balcony
05 Larger windows for the view

Tradition, modernised

Phinisi drawings on a drafting table

Old hull, new systems

Phinisi began as cargo vessels; their strong hulls and elegant lines now make them ideal liveaboards. Builders keep the ironwood or teak hull and fit contemporary interiors, navigation and propulsion.

  • Hull Ironwood or teak, built with centuries-old techniques.
  • Systems Modern navigation, communication, safety equipment and engines.
  • Sustainability Waste management systems and fuel-efficient engines on many new designs.

Custom build at a glance

Months to build
12–24
Build stages, design to sea trial
7
Traditional build yards
Sulawesi
From brief to handover
1 desk

Timelines vary with size and specification; confirmed on enquiry.

Good to know

Custom Komodo boats

What new designs are available in 2027?

Mostly modernised phinisi and contemporary liveaboards: air-conditioned en-suite cabins, large sundecks, advanced navigation, open-plan communal areas, larger windows, and options such as efficient waste management and solar power.

How long does a custom Komodo boat take?

Typically 12–24 months. The process runs from design consultation and drawings through material sourcing, hull construction, fit-out and engine installation to final sea trials.

Why build new rather than buy used?

Full control of design and layout, modern engines, navigation and safety equipment, and a vessel built to current maritime regulations from the outset.

All boat sales FAQ
White phinisi under sail

Have a design in mind?

Send your cabin count, intended use and timeline. We reply with indicative figures and how a custom build would run.